Skip to content

IRONMAN 70.3, Zell am See, 29 Aug 2027

How to train for IRONMAN 70.3 Zell am See-Kaprun

Between a lake start and a flat run, this half distance race sends you into the mountains. The course data says the climbing is the short part of your day.

By Kian Briel, founder. Updated

113 kmTotal distance
1,068 mTotal climbing
6 h 06 minFinish time, Trained level
21°CWater temperature, 2025
01Times

Expected race times

The bike is about half of every level’s day

  1. Recreational
  2. Trained
  3. Competitive
  4. Elite

A Trained athlete finishes in about six hours

For a typical athlete at each level, not a prediction for you.

Times by level, in hours and minutes
LevelSwimBikeRunFinish
Recreational0 h 453 h 412 h 257 h 01
Trained0 h 383 h 172 h 016 h 06
Competitive0 h 332 h 481 h 435 h 14
Elite0 h 302 h 341 h 314 h 44

Each step up a level saves less time than the one before. Recreational to Trained is almost an hour, Trained to Competitive about fifty minutes, and Competitive to Elite half an hour.

Between Recreational and Trained the bike and the run each give back about twenty-five minutes, and the swim only a few. A beginner's day is a little over seven hours. The page has no cut-off times for this race, so there's no deadline to measure that against.

02Power and pace

Power and pace

Held steady from start to finish, for a 75 kg rider

Bike power and run pace by level
LevelBike powerRun pace
Recreational148 watts6:49 min per km
Trained182 watts5:40 min per km
Competitive249 watts4:49 min per km
Elite316 watts4:16 min per km

Around 180 watts is what a Trained rider holds on this bike, and a Recreational rider about 150. That number stays the same on the climbs. You go slower uphill and faster down, and the effort doesn't change.

On the run, a Trained athlete holds about five forty per kilometre and a Recreational athlete a little under seven minutes. The run is flat, so pace is the one thing you control, and the bike decides whether it holds.

03Course

The course

The bike is hilly and the run is rolling

Each box is 621 metres high.

  • Swimopen water
  • Bikehilly
  • Runrolling
Hill profile89.4 km · +954 m climb
020406080Distance in km6007008009001000110012001300Height in m

You swim 1.9 km in Lake Zell. The start is at the Strandbad, and transition is in the Alois Latini Stadium in Schüttdorf right beside it. You take your blue bike bag from the rack when you come in and hang your wetsuit in it when you leave.

The bike is one loop of 90 km with about 950 metres of climbing. The organiser's route goes from Zell am See through Bruck and Taxenbach to Dienten am Hochkönig. Maria Alm and Maishofen come next. Piesendorf and Kaprun bring you back to Zell am See. The highest point is the Filzensattel pass. The file puts the long climbing in the first half, and after the descent the road stays flat for roughly the last forty kilometres.

The run is a flat, fast half marathon along the lake promenade in Zell am See, with about a hundred metres of climbing in all.

What the course asks for

On every leg, two things lead. You need to keep going for hours, and you need legs that hold a steady effort for a long time. Still moving well late in the day sits a step below, and it matters because the run comes after a hard bike.

Where it is decided

The steepest sustained climb is about 2.56 km at 7.8 percent. It takes just under a tenth of your bike time. It feels like the whole race while you're on it, and it isn't.

The run is two flat stretches. The second is the longer one and holds nearly two thirds of your run time. That's where the climb is paid for. If you went over your watts on the way up, you meet the bill there.

Getting it wrong

In the spring, skip the endless hill repeats that the word hilly invites. Most of the day is flat, and the work that pays is long, steady riding.

Don't ride the climbs above your number. The descent gives a few minutes of rest, then the flat asks for exactly the effort you've already spent.

And don't start the run at the pace you'd run fresh. In a warm year like 2024 you start it after hours in the heat, and a fast first few kilometres turns into a slow finish.

04Weather

Weather and water

Race day has been warm and dry, with little wind

Air and water from the organiser, wind and rain from a weather archive.

Race day weather by year
YearAir °CWater °CWindRain
202615 to 25No recordLight windDry
202516 to 2121Light windDry
202416 to 3023Light windDry

Expect a dry race day with little wind. In all three years the archive shows almost no rain and a light breeze. The gusts reached about 37 kilometres an hour in 2024, the warmest of the three years, and stayed around 20 in the other two.

The organiser's course page averages the water at 17 degrees, cooler than the two years it recorded. This page has no wetsuit rule for the race, so look for it in the athlete guide.

05Past editions

Past editions

  1. 2024Course recordSource for 2024
  2. 2025Course recordSource for 2025
  3. 2026Course recordSource for 2026

A course record fell in each of the last three races. In 2024 the men's winner broke the standing course best. In 2025 the women's winner set a new course record, and the men's record dates from that year too. The 2026 race took place on 30 August, and its men's winner went about a minute faster than the 2025 record.

The next race is on 29 August 2027, the fifteenth edition.

06Training

How to train for it

The season is 24 weeks long

Every fourth week is lighter, so your body can absorb the work.

  1. Week 1

    Set the routine. A few easy swims, rides and runs to set up your training week.

  2. Weeks 2 to 5

    Aerobic endurance. Mostly long easy sessions, so your body learns to keep going for hours. One short, controlled harder session on the bike and one on the run each week.

  3. Weeks 6 to 9

    Aerobic endurance. The easy hours stay, and steady, comfortably hard efforts start, mostly on the bike.

  4. Weeks 10 to 13

    Aerobic durability. Training reaches its full weekly size. Long steady sessions and more steady efforts, so you still move well late in a long day.

  5. Weeks 14 to 17

    Muscular endurance. The long run grows from one hour to an hour and a half, and the bike gets sessions at or near race pace, so your legs hold the pace for longer.

  6. Weeks 18 to 21

    Threshold capacity. Raise the hardest effort you can hold for about an hour.

  7. Weeks 22 to 23

    Taper. Training comes down step by step. Short race-pace pieces and a bike-to-run session keep you sharp, so you arrive fresh.

  8. Week 24

    Race week. Short easy sessions with a few touches of race pace, then race day.

This is the season Nymiva lays out for a beginner before it knows anything about you. Aerobic endurance gets two blocks because this race asks for it most, on every leg. For the course itself, do your long rides on rolling roads and hold your steady watts on the climbs instead of surging. Then run off the bike on flat ground.

07Your plan

Why a personal plan

This page doesn't know how fast you swim, what power you can hold, or how many hours you have on a weekday evening.

Nymiva starts from your own training history. It finds what Zell am See asks that you can't show yet and trains that first. It checks every session against what it was meant to train, and your plan only changes when you change it or approve a change. You don't need a power meter for any of it.

If your plan is already working, keep it. If you want a season built around your own numbers for this race, that's what Nymiva does.

Your numbers, this course

Analyze IRONMAN 70.3 Zell am See-Kaprun against my fitness

The first 14 days are free, no card needed.

The Season page of a 53 week duathlon season, on its Load and fitness tab. The planned load of 20,823, the actual load so far of 1,585 and a compliance of 84 percent sit above a week by week chart. Its load bars are coloured by phase, from prep and foundation through event shaping to the peak, with the fitness and fatigue trends drawn across them and the goal event flagged at the end.

Questions people ask

In Nymiva's simulation of this course a Trained athlete finishes in 6:06:26 and a Recreational athlete in 7:01:01. Those are times for a typical athlete at each level, not a prediction for you.

The organiser recorded 23 C in 2024 and 21 C in 2025, and published no water figure for 2026. Its course page gives no wetsuit rule, so check the athlete guide in race week.

The organiser calls it hilly, and its file measures 954 m of climbing over 89.4 km. The highest point is the Filzensattel pass. After the descent the road is flat back to Zell am See.

The shortest season Nymiva builds for a half distance is 24 weeks. A more ambitious goal makes it longer, never shorter.

Course data from the organiser’s published files, analysed 24 Sep 2026 by engine 1, demand model 4. Times are simulated for a typical athlete at each level and are not a prediction for anyone. Nothing on this page is medical advice. Past editions and race-day wind and rain come from public sources, each linked or named on the page.

IRONMAN® and IRONMAN 70.3® are registered trademarks, and 5150 is a trademark, of World Triathlon Corporation. Nymiva is an independent training platform and is not affiliated with, sponsored by or endorsed by World Triathlon Corporation. Course data is read from the organiser’s public course pages for the purpose of describing the event.

A note on cookies

We use strictly necessary cookies to keep you signed in and Nymiva running. With your permission we would also use analytics to understand and improve it. Read the Cookie Policy.